The machine is used for the completion of pumps after they have left the pump test stand. In the first station they are blown out once more to reduce the residual oil level. In the second station the O-ring is installed with help of an operator. In the third station the parts are marked with all necessary information by means of a laser. Followed by the fourth station, which verifies the labelling and other criteria of the pump by a camera system. This is followed by the last station where an operator is able to mount the caps and, upon successful testing with a further camera system, releases them for packaging.
If a characteristic falls out of the tolerances during the test, these pumps will be transported to a separate reworking belt, where they can then be reworked and reintroduced for a new test.
Highlights
- Up to 15 camera evaluations are possible which can be made very flexible with help of the robot
- Workpiece carrier with RFID system
- Datamatrix and text caption with 3D laser
- Rework instruction via image-guided selection windows
- Color and high-resolution cameras
- Working instructions via panel PC‘s at all workstations
Technical data
- Cycle time scalable up to 15 s
- Production of x different types possible
- One piece flow concept
- Low test media consumption
- Server for data management